logo
Project

Kenya - El Nino Infrastructure Rehabilitation Project

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

The El Nino Infrastructure Rehabilitation Project is conceived in response to the unusually heavy rainfall that occurred between 1997 and 1998. These falls caused severe flooding with impacts in 46 of the country's 61 districts. The project was intended primarily to support Government initiatives to mitigate the severe effects of floods on the water and road infrastructure sectors. The project aim

Sector
Residential, Commercial, Water Supply and Storage, Road, Raw Materials, Government
Location
Kenya
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Kenya - El Nino Infrastructure Rehabilitation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Kenya - El Nino Infrastructure Rehabilitation Project” is an infrastructure initiative in the Residential sector, located in Kenya. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The El Nino Infrastructure Rehabilitation Project is conceived in response to the unusually heavy rainfall that occurred between 1997 and 1998. These falls caused severe flooding with impacts in 46 of the country's 61 districts. The project was intended primarily to support Government initiatives to mitigate the severe effects of floods on the water and road infrastructure sectors. The project aims at the rehabilitation of hydraulic and road infrastructures of the affected areas in the provinces of West, Nyanza and East. It should result in the rehabilitation and capacity building of water supply systems in nearly thirty-three (33) cities, as well as in the rehabilitation of access to cities and towns through rehabilitation of roads. The main components of the project are: (i) the supply of chemicals; (ii) the replacement of components of the national water resources control network; (iii) replacement and repair of components and equipment of the water supply system, and (iv) rehabilitation of 74 different categories of roads.

Original sector

Emergency Response

Budget

Location

Country

Kenya

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Residential, Commercial, Water Supply and Storage, Road, Raw Materials, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project