logo
Project

Kenya - Last Mile Connectivity Project III

Sector: Raw Materials • Location: Kenya

Source: African Development Bank (AfDB)

The Last Mile Connectivity Project III aims to increase on-grid electricity access for households, social-based infrastructure facilities, and micro, small and medium-sized enterprises. It is a follow-up to the first and second phases of the last mile connectivity operations (i.e., LMCP I and LMCP II) financed by the African Development Fund (ADF) and the African Development Bank (ADB), respective

Sector
Raw Materials, Commercial, Water Supply and Storage, Biomass, Power Generation (CCGT), Government
Location
Kenya
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Kenya - Last Mile Connectivity Project III

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Kenya - Last Mile Connectivity Project III” is an infrastructure initiative in the Raw Materials sector, located in Kenya. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Last Mile Connectivity Project III aims to increase on-grid electricity access for households, social-based infrastructure facilities, and micro, small and medium-sized enterprises. It is a follow-up to the first and second phases of the last mile connectivity operations (i.e., LMCP I and LMCP II) financed by the African Development Fund (ADF) and the African Development Bank (ADB), respectively, and is directly aligned with the United Nations Sustainable Development Goal (SDG) 7 of ensuring access to affordable, reliable, sustainable, and modern energy for all. The third phase of the Last Mile Electricity Connectivity Project is an infrastructure development intervention that will increase access to adequate, affordable, and reliable electricity for households and public institutions as well as micro, small and medium-sized enterprises (MSMEs) thereby providing an enabling environment for the realization of Vision 2030. The project comprises five main components namely: (i) system reinforcement, (ii) grid extensions comprising densifications, intensifications, and last-mile connections, (iii) project administration and management, (iv) Institutional support and capacity building and (v) Implementation of the Resettlement Policy Framework (RPF) and Environmental and Social Management Framework (ESMF). This project primarily contributes to climate mitigation results. As such, 100% of the total approved amount is attributed as climate finance, of which 100% is dedicated to mitigation.

Original sector

Energy

Budget

Location

Country

Kenya

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Commercial, Water Supply and Storage, Biomass, Power Generation (CCGT), Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project