Kenya - Last Mile Connectivity Project III
Sector: Raw Materials • Location: Kenya
Source: African Development Bank (AfDB)
The Last Mile Connectivity Project III aims to increase on-grid electricity access for households, social-based infrastructure facilities, and micro, small and medium-sized enterprises. It is a follow-up to the first and second phases of the last mile connectivity operations (i.e., LMCP I and LMCP II) financed by the African Development Fund (ADF) and the African Development Bank (ADB), respective
- Sector
- Raw Materials, Commercial, Water Supply and Storage, Biomass, Power Generation (CCGT), Government
- Location
- Kenya
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Kenya - Last Mile Connectivity Project III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Last Mile Connectivity Project III aims to increase on-grid electricity access for households, social-based infrastructure facilities, and micro, small and medium-sized enterprises. It is a follow-up to the first and second phases of the last mile connectivity operations (i.e., LMCP I and LMCP II) financed by the African Development Fund (ADF) and the African Development Bank (ADB), respectively, and is directly aligned with the United Nations Sustainable Development Goal (SDG) 7 of ensuring access to affordable, reliable, sustainable, and modern energy for all. The third phase of the Last Mile Electricity Connectivity Project is an infrastructure development intervention that will increase access to adequate, affordable, and reliable electricity for households and public institutions as well as micro, small and medium-sized enterprises (MSMEs) thereby providing an enabling environment for the realization of Vision 2030. The project comprises five main components namely: (i) system reinforcement, (ii) grid extensions comprising densifications, intensifications, and last-mile connections, (iii) project administration and management, (iv) Institutional support and capacity building and (v) Implementation of the Resettlement Policy Framework (RPF) and Environmental and Social Management Framework (ESMF). This project primarily contributes to climate mitigation results. As such, 100% of the total approved amount is attributed as climate finance, of which 100% is dedicated to mitigation. |
Original sector | Energy |
Budget |
Location
Country | Kenya |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Commercial, Water Supply and Storage, Biomass, Power Generation (CCGT), Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Kenya
- Lake Turkana Wind Power Project Loyangalani
- LAKE CHALLA INTEGRATED WATER RESOURCE DEVELOPMENT PROJECT
- DEVELOPMENT OF LOWER TURKWEL IRRIGATION PROJECT UNDER SUGARCANE PRODUCTION
- Thornridge Gardens Apartments Project
- COTTAGE TEA FACTORY
- LUGARI MAIZE MILLING PLANT
- Ewaso Ng'iro Tannery and Leather Factory
- Oserian Two Lakes Industrial Park
