logo
Project

Kenya - Thika Thermal Power Project

One of 7,540 projects Taiyo tracks in Kenya.

Source: African Development Bank (AfDB)

Diversifying power generation sources in Kenya is necessary; and fossil-fuel powered plants are considered viable options, whilst the further development of hydro power resources is assessed. The proposed power plant at Thika is included in Kenya’s Least Cost Power Development Plan, one among three plants which are to contribute to increasing the availability of electricity on the national grid –

Sector
Oil and Gas, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Hydro, Geothermal, Forest Products and Packaging, Road, Natural Gas, Raw Materials, Government
Location
Kenya
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Kenya - Thika Thermal Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Kenya - Thika Thermal Power Project” is an infrastructure initiative in the Oil and Gas sector, located in Kenya. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Diversifying power generation sources in Kenya is necessary; and fossil-fuel powered plants are considered viable options, whilst the further development of hydro power resources is assessed. The proposed power plant at Thika is included in Kenya’s Least Cost Power Development Plan, one among three plants which are to contribute to increasing the availability of electricity on the national grid – complementing the Kenya Power and Lighting Company’s (KPLC) transmission and substation project that is under construction (independently of this proposed project). It is fully aligned with the Country’s Strategy Paper (2008-2013) for Kenya which has been elaborated to support two strategic objectives: (i) the development of infrastructures to support economic growth; and (ii) the creation of employment opportunities to reduce poverty. Within this framework, the country specifically intends to address the problems related to the irregularity of its electricity supply. This document is aligned on the long-term development strategy of the country, namely the Vision 2030, which is aware of the fact that the costs of energy in Kenya are currently higher than those of other African competing economies. To stimulate growth and attract investment, Kenya must produce electricity at an economic cost, and increase the efficiency of energy consumption. Aware of its energy needs in order to achieve these objectives of the Vision 2030, the Government has envisioned an ambitious plan to increase its energy production in order to expand current installed capacity. This power plant at Thika aims to satisfy the rapidly growing demand for electricity, while diversifying sources of energy supply.

Original sector

Energy

Budget

Location

Country

Kenya

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Oil and Gas, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Hydro, Geothermal, Forest Products and Packaging, Road, Natural Gas, Raw Materials, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project