Kenya - Timboroa-Eldoret Road Rehabilitation Project
One of 7,540 projects Taiyo tracks in Kenya.
Source: African Development Bank (AfDB)
The Timboroa – Eldoret Road Rehabilitation Project is part of the Northern Transport Corridor international road, one of the Government?s priority corridors. The project involves the rehabilitation of 73 km of road section. This road was reconstructed in 1992 with bituminous surfacing and currently operates beyond capacity, carrying a weighted average of about 4,200 vehicles per day. The road has
- Sector
- Automotive, Road, Government
- Location
- Kenya
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Kenya - Timboroa-Eldoret Road Rehabilitation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Timboroa – Eldoret Road Rehabilitation Project is part of the Northern Transport Corridor international road, one of the Government?s priority corridors. The project involves the rehabilitation of 73 km of road section. This road was reconstructed in 1992 with bituminous surfacing and currently operates beyond capacity, carrying a weighted average of about 4,200 vehicles per day. The road has since deteriorated and the poor condition of the road represents increased transportation cost and transit time. The total project cost is UA 38.92 million and ADF loan will cover 89.9% (UA 35 million) and the Government of Kenya 10.1 % (UA 3.92 million). The overall project implementation time frame is four years (2011 – 2015). The completion of the project will increase intra-regional trade between Kenya and the neighbouring countries of Uganda, Rwanda, Burundi, DRC and Sudan. |
Original sector | Transport & Storage |
Budget |
Location
Country | Kenya |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Automotive, Road, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
