Kenya Private Sector Power Generation Support Project
Source: World Bank
The development objective of the Private Sector Power Generation Support Project is to increase electricity generation through Independent Power Producers (IPP) in Kenya. Kenya's economy is far more diversified than most other countries in Sub-Saharan Africa. About 55 percent of Kenya's Gross Domestic Product (GDP) comes from services, transport, finance, tourism, information and communications te
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The development objective of the Private Sector Power Generation Support Project is to increase electricity generation through Independent Power Producers (IPP) in Kenya. Kenya's economy is far more diversified than most other countries in Sub-Saharan Africa. About 55 percent of Kenya's Gross Domestic Product (GDP) comes from services, transport, finance, tourism, information and communications technology (ICT) and trade sectors that are critically dependent on reliable electricity supply. The main components of a diesel combined cycle plant are the diesel engines, the heat recovery system, the steam turbine generator, the fuel conditioning system and the water cooling system. The plant will be designed for continuous base load operation with a capability of running at ten percent over load for very short periods for governing purposes during grid disturbances; all engines will be able to operate at full output with the exception for maintenance outages. A desulphurization unit will be included which will enable the plant to use a higher viscosity and cheaper fuel should the need arise to help reduce fuel costs. Construction of the power plant will be undertaken through a fixed price turnkey Engineering and Procurement and Construction (EPC) contract with the XJ International Engineering Corporation part of the XJ Group of China. The XJ Group will also be responsible for the operation and maintenance of the plant for the initial five years of operation. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
