logo
ProjectPipeline

Kenya Urban Mobility Improvement Project

Sector: Mass Transit • Location: Kenya

Source: World Bank Group

The project aims to transform the Nairobi Metropolitan Area (NMA) mobility landscape by upgrading the commuter rail into a modern urban rail system, reforming the institutional framework for urban transport, and supporting integrated land‑use planning around stations with the following components and activities.Component 1: Urban Mobility Improvement in Nairobi Metropolitan AreaThis component supp

Status
Prospective
Sector
Mass Transit, Education, Telecommunications, Commercial, Rail, Road, Government
Location
Kenya
Updated
19 Nov 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Kenya Urban Mobility Improvement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kenya Urban Mobility Improvement Project” is an infrastructure initiative in the Mass Transit sector, located in Kenya. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

pipeline

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project aims to transform the Nairobi Metropolitan Area (NMA) mobility landscape by upgrading the commuter rail into a modern urban rail system, reforming the institutional framework for urban transport, and supporting integrated land‑use planning around stations with the following components and activities.Component 1: Urban Mobility Improvement in Nairobi Metropolitan AreaThis component supports the transformation of the 57 km Nairobi Central–Thika commuter rail into a modern, high‑capacity urban rail system.Subcomponent 1.1: Upgrading Commuter Rail into Urban MetroIncludes the following: feasibility and basic design, including electrification readiness;Development of urban rail design and operational standards (gender-responsive, resilient, universally accessible);Track, signaling, telecom, and station upgrades; Modernization of stations; multimodal interchanges, and station utilities; Establishment of metro maintenance facilities; Implementation of KRC’s integrated ERP system for operations and customer service.; Technical assistance for integrating feeder bus services; Implementation of Resettlement Action Plans.Subcomponent 1.2: Green Mobility Solutionsincludes: Procurement of DEMU trainsets and roadmap for transition to EMUs; Development of a national railway electrification strategy.Support to operationalization of Kenya’s e‑mobility policy; Technical assistance for carbon financing opportunities.citeturn1search1L1.2 sectionSubcomponent 1.3: Kenya Integrated Automated Fare Collection System (KIAFCS) – Phase 1includes: Establish national standards, regulations, and policy framework for the integrated fare collection system; Deployment of system infrastructure along the Nairobi–Thika corridor; Support to KRC as the early adopter; Development of national scale‑up plan.Component 2: Transit‑Oriented Development (TOD) Along Commuter Rail Supports integrated land‑use planning and urban regeneration around selected stations through: Corridor‑level TOD plan and station‑area land‑use plans (500 m radius); Implementation of TOD at approximately seven stations, including anchor public facilities; Access improvements within 1 km (and up to 3 km for major roads), including pedestrian and cycling infrastructure, lighting, drainage, and landscaping; Development of KRC land value capture strategy to attract private sector investment.Component 3: Institutional Strengthening for Urban Mobility SolutionsSupports enabling policy and institutional reforms needed for sustainable urban transport: Development and implementation of National Urban Transport Policy; Establishment of urban mobility funding mechanisms (including potential securitization of the Railway Development Levy) ; Support for sustainable urban mobility plan and integrated public transport network for NMA; Support to reform KRC structure, including creation of metro and land subsidiaries; Development of national TOD policy and guidelines; Establishment of Transport Center at the University of Nairobi (master’s program in urban transport).Capacity building in road safety, gender-responsive planning, PPPs, and preparation for future projects.Component 4: Contingent Emergency Response Component (CERC)

Budget

Location

Country

Kenya

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Education, Telecommunications, Commercial, Rail, Road, Government

Article published date

2026-03-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project