Kenya Urban Mobility Improvement Project
Sector: Mass Transit • Location: Kenya
Source: World Bank Group
The project aims to transform the Nairobi Metropolitan Area (NMA) mobility landscape by upgrading the commuter rail into a modern urban rail system, reforming the institutional framework for urban transport, and supporting integrated land‑use planning around stations with the following components and activities.Component 1: Urban Mobility Improvement in Nairobi Metropolitan AreaThis component supp
- Status
- Prospective
- Sector
- Mass Transit, Education, Telecommunications, Commercial, Rail, Road, Government
- Location
- Kenya
- Updated
- 19 Nov 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Kenya Urban Mobility Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pipeline |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project aims to transform the Nairobi Metropolitan Area (NMA) mobility landscape by upgrading the commuter rail into a modern urban rail system, reforming the institutional framework for urban transport, and supporting integrated land‑use planning around stations with the following components and activities.Component 1: Urban Mobility Improvement in Nairobi Metropolitan AreaThis component supports the transformation of the 57 km Nairobi Central–Thika commuter rail into a modern, high‑capacity urban rail system.Subcomponent 1.1: Upgrading Commuter Rail into Urban MetroIncludes the following: feasibility and basic design, including electrification readiness;Development of urban rail design and operational standards (gender-responsive, resilient, universally accessible);Track, signaling, telecom, and station upgrades; Modernization of stations; multimodal interchanges, and station utilities; Establishment of metro maintenance facilities; Implementation of KRC’s integrated ERP system for operations and customer service.; Technical assistance for integrating feeder bus services; Implementation of Resettlement Action Plans.Subcomponent 1.2: Green Mobility Solutionsincludes: Procurement of DEMU trainsets and roadmap for transition to EMUs; Development of a national railway electrification strategy.Support to operationalization of Kenya’s e‑mobility policy; Technical assistance for carbon financing opportunities.citeturn1search1L1.2 sectionSubcomponent 1.3: Kenya Integrated Automated Fare Collection System (KIAFCS) – Phase 1includes: Establish national standards, regulations, and policy framework for the integrated fare collection system; Deployment of system infrastructure along the Nairobi–Thika corridor; Support to KRC as the early adopter; Development of national scale‑up plan.Component 2: Transit‑Oriented Development (TOD) Along Commuter Rail Supports integrated land‑use planning and urban regeneration around selected stations through: Corridor‑level TOD plan and station‑area land‑use plans (500 m radius); Implementation of TOD at approximately seven stations, including anchor public facilities; Access improvements within 1 km (and up to 3 km for major roads), including pedestrian and cycling infrastructure, lighting, drainage, and landscaping; Development of KRC land value capture strategy to attract private sector investment.Component 3: Institutional Strengthening for Urban Mobility SolutionsSupports enabling policy and institutional reforms needed for sustainable urban transport: Development and implementation of National Urban Transport Policy; Establishment of urban mobility funding mechanisms (including potential securitization of the Railway Development Levy) ; Support for sustainable urban mobility plan and integrated public transport network for NMA; Support to reform KRC structure, including creation of metro and land subsidiaries; Development of national TOD policy and guidelines; Establishment of Transport Center at the University of Nairobi (master’s program in urban transport).Capacity building in road safety, gender-responsive planning, PPPs, and preparation for future projects.Component 4: Contingent Emergency Response Component (CERC) |
Budget |
Location
Country | Kenya |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Education, Telecommunications, Commercial, Rail, Road, Government |
Article published date | 2026-03-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in Kenya
- Oserian Two Lakes Industrial Park
- Tsavo Power Company Limited (Kipevu II)
- CONSTRUCTION OF EPZA WAREHOUSES
- Mombasa Container Terminal
- Lamu-Isiolo Interregional Standard Gauge Railway
- Naivasha-Kisumu Standard Gauge Railway Project (Phase 2B)
- PORT OF LAMU AGRIBULK TERMINAL
- Construction of Greater Southern Bypass
