logo
ProjectClosed

Keogh River Bridge Replacement REBID

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Work under this Contract includes: 1. Fabrication, supply, and install a 29.28m span steel composite bridge over the Keogh River; 2. Assess the capacity of the existing bridge as required for use by the Contractor during construction. The Contractor shall engage their own engineer to evaluate the existing bridge and determine its safe working capacity for use during construction. Contractor to pro

Status
Closed
Sector
Bridge, Manufacturing (Industrial), Steel, Road, Metal, Commercial, Seaport
Location
Port Hardy, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Keogh River Bridge Replacement REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Keogh River Bridge Replacement REBID” is an infrastructure initiative in the Bridge sector, located in Port Hardy, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work under this Contract includes: 1. Fabrication, supply, and install a 29.28m span steel composite bridge over the Keogh River; 2. Assess the capacity of the existing bridge as required for use by the Contractor during construction. The Contractor shall engage their own engineer to evaluate the existing bridge and determine its safe working capacity for use during construction. Contractor to provide temporary bridge and/or access platforms if required to construct the new bridge; 3. Remove ...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Port Hardy

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Manufacturing (Industrial), Steel, Road, Metal, Commercial, Seaport

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project