logo
ProjectClosed

Kerandari Coal Block

Sector: Geothermal • Location: Hazaribagh, Jharkhand, India

Source: India Investment Grid (IIG)

Information National Thermal Power Corporation [NTPC] has come up with Kerandari Coal Block with a ticket size of 2804 INR Crores. This project in Coal sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Ministry of coal allocated the Kerandari coal block to NTPC on 08.09.2015 under CMSP Act

Status
Closed
Sector
Geothermal, Power Generation (CCGT), Road, Government, Nuclear, Wind
Location
Hazaribagh, Jharkhand, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Kerandari Coal Block

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kerandari Coal Block” is an infrastructure initiative in the Geothermal sector, located in Hazaribagh, Jharkhand, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Company

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information National Thermal Power Corporation [NTPC] has come up with Kerandari Coal Block with a ticket size of 2804 INR Crores. This project in Coal sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Ministry of coal allocated the Kerandari coal block to NTPC on 08.09.2015 under CMSP Act, it has Geological reserves of 285 MT, Production Target: Nov.2019 Annual rated capacity: 6 MTPA, Geological Report available. Mining Plan approved by MOC. Environment Clearance accorded by MOEF. Stage-I forest clearance accorded by MOEF. MDO - Under tendering. All notifications for mining area land acquisition completed. RAP approved by NTPC Board. Payment for 769 acres of land compensation disbursed to Project Affected families, till date. Govt. of Jharkhand transferred 242 acres of Govt. land to NTPC. Total expenditure of approx Rs 1369 Cr incurred so far. Stage-II forest clearance was accorded by MOEF&CC on 28.08.2019. Consent to operate accorded by JSPCB on 28.12.2019. Seam opening permission granted by Coal Controller on 13.01.2020. Forest land transferred and tree cutting permission granted to NTPC in Jan22. Start of mining by Apr23. Issues- Relocation / resettlement of priority 205 Homestead Oustees HSOs from 1st yr. mining area and priority 32 HSOs from the conveyor corridor area. Resolving / authentication of - Bakast Land 2.94 acres- No Mutation Cases 0.40 acres- Without title / dispute cases [5.11 acres], which are required urgently for 1st year of mining.

Original sector

Coal

Procurement method

Budget

Location

Country

India

State

Jharkhand

City

Hazaribagh

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Geothermal, Power Generation (CCGT), Road, Government, Nuclear, Wind

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project