Kerarbury Almond Orchard Solar and Battery Project
Sector: Raw Materials • Location: Griffith, New South Wales, Australia
Source: One Step Off The Grid
The Kerarbury almond orchard has installed a 5.99MW solar farm and a 2.3MW/4.5MWh battery energy storage system to reduce costs and emissions. This project aims to achieve up to 83% renewable energy penetration and will be part of AGL Energy's virtual power plant.
- Status
- Closed
- Sector
- Raw Materials, Power Generation (CCGT), Energy Storage, Solar
- Location
- Griffith, New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- One Step Off The Grid
ConstructChat
Ask ConstructChat about Kerarbury Almond Orchard Solar and Battery Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Kerarbury almond orchard has installed a 5.99MW solar farm and a 2.3MW/4.5MWh battery energy storage system to reduce costs and emissions. This project aims to achieve up to 83% renewable energy penetration and will be part of AGL Energy's virtual power plant. |
Original sector | Energy |
Location
Country | Australia |
State | New South Wales |
City | Griffith |
Source
Source | One Step Off The Grid |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Power Generation (CCGT), Energy Storage, Solar |
Article published date | 2025-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
