Kerarbury Farm Solar Project
One of 10,000+ projects Taiyo tracks in Australia.
Source: PR Newswire
The Kerarbury Farm is a 6MW renewable energy park developed for an Australian almond orchard, utilizing high-performance solar modules from Trinasolar. It is expected to generate up to 14,000MWh of solar energy annually, significantly reducing reliance on diesel and grid energy for the almond farm operator.
- Status
- Closed
- Sector
- Raw Materials, Consumer Products, Solar
- Location
- Griffith, Australia
- Updated
- 22 Jul 2026
- Source
- PR Newswire
ConstructChat
Ask ConstructChat about Kerarbury Farm Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Kerarbury Farm is a 6MW renewable energy park developed for an Australian almond orchard, utilizing high-performance solar modules from Trinasolar. It is expected to generate up to 14,000MWh of solar energy annually, significantly reducing reliance on diesel and grid energy for the almond farm operator. |
Original sector | Energy |
Location
Country | Australia |
City | Griffith |
Source
Source | PR Newswire |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Consumer Products, Solar |
Article published date | 2025-05-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
