logo

Keta Sea Defence Project

Sector: Aerospace & Defense • Location: Keta, Volta Region, Ghana

Source: MyJoyOnline

Project
Completed

The Keta Sea Defence Project (KSDP) was initiated to control floodwaters from the Keta Lagoon to the Atlantic Ocean, protecting life and property from destruction and preventing land loss due to erosion. The project was funded by the EXIM Bank of the USA and involved stabilizing the shoreline and preventing flooding.

Status
Closed
Sector
Aerospace & Defense
Location
Keta, Volta Region, Ghana
Updated
22 Jul 2026
Source
MyJoyOnline

ConstructChat

Ask ConstructChat about Keta Sea Defence Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Keta Sea Defence Project” is an infrastructure initiative in the Aerospace & Defense sector, located in Keta, Volta Region, Ghana. Taiyo aggregates data on it from MyJoyOnline.

Participants

Not available for this record.

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Keta Sea Defence Project (KSDP) was initiated to control floodwaters from the Keta Lagoon to the Atlantic Ocean, protecting life and property from destruction and preventing land loss due to erosion. The project was funded by the EXIM Bank of the USA and involved stabilizing the shoreline and preventing flooding.

Original sector

Coastal Protection

Budget

Location

Country

Ghana

State

Volta Region

City

Keta

Source

Source

MyJoyOnline

URL

More Details

Record type

Project

Sector

Aerospace & Defense

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project