Kettle Foods Processing Plant – Potato Chip Facility

Sector: Biomass • Location: United States

Source: Food Technology

Project
Closed

The building has 18 wind turbines to help offset its electricity use. The exterior of the facility. The restored prairie land surrounding the facility. The construction used sustainable materials as much as possible. In January 2006 Kettle Foods Inc announced the construction of a production plant in Beloit, Wisconsin, US. Kettle Foods, which was acquired in August 2006 by Lion Capital, has its he

Project Information FAQ

Project Information

3 Q
The project “Kettle Foods Processing Plant – Potato Chip Facility” is an infrastructure initiative in the Biomass sector, located in United States. Taiyo aggregates data on it from Food Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The building has 18 wind turbines to help offset its electricity use. The exterior of the facility. The restored prairie land surrounding the facility. The construction used sustainable materials as much as possible. In January 2006 Kettle Foods Inc announced the construction of a production plant in Beloit, Wisconsin, US. Kettle Foods, which was acquired in August 2006 by Lion Capital, has its headquarters in Salem, Oregon, and a plant in Norwich, UK. The company has a 31% market share in the natural potato chip market and produces more than 20 flavours and four varieties of potato chips, eight flavours of organic tortilla chips and a variety of nut butters and trail mixes. On 31 March 2010 Kettle Foods was acquired by Diamond Foods from Lion Capital. Diamond Foods paid $615m in cash for the acquisition. Daimond Foods took control of Kettle’s operations in both the US and UK through the acquisition. Location Beloit was chosen for the plant’s location due to the city’s position in the middle of the largest growing regions for the Russet Burbank potato. Also, the economic incentives from the state included a $500,000 development loan from Wisconsin Department of Commerce for creating 95 jobs and $510,000 from the City of Beloit. An estimated investment of $11m was put into building the 73,500ft² facility (estimates in 2007 indicated that there would be an economic benefit to the state of Wisconsin of around $18m). The plant processes around 50 million pounds of Russet potatoes a year and overall company production has been boosted by 50%. Environmental credentials Kettle Foods has a focus on environmental sustainability for all its facilities and the company wanted to make the greenfield Beloit plant as environmentally friendly as possible. It also sought to achieve LEED gold status (Leadership in Energy and Environmental Design from the US Green Building Council) during the build. Environmental achievements The plant was started up in September 2007 and its environmental and energy claims include: For Tim Fallon, president of Kettle Foods North America, investement in green building was a conscious decision on the part of the company to demonstrate its values in a very tangible way. “Our employees have always encouraged us to look at ways to minimise our impact on the environment – from rooftop solar power panels to biodiesel fuel from our used cooking oil. Sustainable initiatives are business as usual at Kettle Foods,” he said at the plant’s opening In September 2008, one year after the plant opened, Kettle Foods had made annual energy savings of 20%, with an estimated cost reduction of $110,000 on natural gas and $51,000 on electricity. In addition, reclamation systems allowed capture and reuse of 3.4 million gal of water, giving the factory annual water savings of $34,000. The facility also recycles 2,300 gal of waste oil every month, which is converted to biodiesel and used to fuel a fleet of ‘BioBeetles’ diesel VW Beetle cars. Construction The 73,000ft² building was designed by Flad & Associates of Wisconsin, an architect with experience in LEED projects. The site in Beloit was chosen by Kettle Foods in conjunction with A Epstein and Sons International of Chicago, Illinois. The general contractor for the project was Affiliated Construction Services (ACS), the engineer of record was Affiliated Engineers Inc and the civil engineers were Batterman & Co RH. The plant’s 18 wind turbines were supplied by AeroVironment. The building used 38,000ft² of Spancrete precast concrete panels around a minimal steel frame to build the walls of the facility and the cut outs for doors and windows were recycled into aggregate. The construction also used such materials as YOLO Colorhouse zero-VOC (volatile organic compounds) paint. The five acres of prairie surrounding the plant was restored using native prairie grasses by Tallgrass Restoration, an environmental landscape company based in Wisconsin.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data