Keweenaw Stamp Sands Dredging
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The Work, Keweenaw Stamp Sands Dredging, includes but is not necessarily limited to: With 48 hours notice, periodically excavate and stage stamp sands from the beach at Grand Traverse Harbor to prevent stamp sands from overtopping the harbor break wall. During the winter, load and haul the stamp sands from the entire pocket footprint to the existing disposal area at Gay.
- Status
- Prospective
- Sector
- Seaport, Manufacturing (Industrial), Commercial
- Location
- Lansing, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Keweenaw Stamp Sands Dredging
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work, Keweenaw Stamp Sands Dredging, includes but is not necessarily limited to: With 48 hours notice, periodically excavate and stage stamp sands from the beach at Grand Traverse Harbor to prevent stamp sands from overtopping the harbor break wall. During the winter, load and haul the stamp sands from the entire pocket footprint to the existing disposal area at Gay. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Lansing |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Seaport, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
