Key Biscayne Branch Library
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The Library requires construction services for a new Key Biscayne Branch library located at 299 Crandon Boulevard in Key Biscayne. The new two-story, approximately 20,000 square foot library will replace the existing 6,200 square foot library built in 1976 at the same location. The building will be LEED silver certified with sustainable features that include rooftop solar panels, electric vehicle
- Status
- Closed
- Sector
- Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Government, Solar, Education, Manufacturing (Industrial), Car parking, Commercial
- Location
- Key Biscayne, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Key Biscayne Branch Library
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Library requires construction services for a new Key Biscayne Branch library located at 299 Crandon Boulevard in Key Biscayne. The new two-story, approximately 20,000 square foot library will replace the existing 6,200 square foot library built in 1976 at the same location. The building will be LEED silver certified with sustainable features that include rooftop solar panels, electric vehicle charging stations in the parking area, and new landscaping that takes advantage of the existing w... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Key Biscayne |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Government, Solar, Education, Manufacturing (Industrial), Car parking, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 20 MDOULES 8 KW INSTALL EV CHARGER
- QLINE Streetcar Overhead Catenary System
- Metropolitan Park
- Sierra Regency Roof Eve Extensions
- 466135 CLOUD PL NE Local Roadway Paving Restoration
- 378944 Alley-47076042 Citywide Alley Restoration
- Community Food Projects Competitive Grant Program
- Hydrogen Delivery Technologies
