Key Energy Storage Project
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project proposes to construct, operate, maintain and provide for the future decommissioning of a battery energy storage facility on approximately 260-acres, along with a new approximately 2,500- foot-long 500-kilovolt transmission line to connect with the existing PG&E Gates Substation located north of the project site. The project in the AE-40 (Exclusive Agricultural, 40-acre minimum parcel s
- Status
- Prospective
- Sector
- Consumer Products, Power Transmission, Power Generation (CCGT), Commercial, Raw Materials, Energy Storage
- Location
- Huron, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Key Energy Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project proposes to construct, operate, maintain and provide for the future decommissioning of a battery energy storage facility on approximately 260-acres, along with a new approximately 2,500- foot-long 500-kilovolt transmission line to connect with the existing PG&E Gates Substation located north of the project site. The project in the AE-40 (Exclusive Agricultural, 40-acre minimum parcel size) Zone District. |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Huron |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Power Transmission, Power Generation (CCGT), Commercial, Raw Materials, Energy Storage |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
