Key Royale Force Main Replacement
Pre-design · Florida · Last reported Mar 2024
Source: Dodge USA
Replace Key Royale (RTU#61) force main (approximately 1,165 linear feet of 4-inch diameter pipe). Replace from the flange in the valve vault to the existing termination manhole #5132. Install p-trap (dip in the Force Main) and line the inside of the manhole and the next two downstream. Grout fill and abandon the existing force main in place.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Anna Maria, Florida, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Key Royale Force Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replace Key Royale (RTU#61) force main (approximately 1,165 linear feet of 4-inch diameter pipe). Replace from the flange in the valve vault to the existing termination manhole #5132. Install p-trap (dip in the Force Main) and line the inside of the manhole and the next two downstream. Grout fill and abandon the existing force main in place. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Anna Maria |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
