logo
ProjectBidding

Keyes Road Culvert Replacement

Sector: Manufacturing (Industrial) • Location: Gardner, Massachusetts, United States of America

Source: Dodge

Storm Sewer. Bids to Owner Public - Local October 29 at 01:00 PM (EDT)

Status
Prospective
Sector
Manufacturing (Industrial), Waste Processing and Treatment, Power Transmission, Road, Steel, Water Supply and Storage, Metal, Power Generation (CCGT), Rail, Cement, Government
Location
Gardner, Massachusetts, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Keyes Road Culvert Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Keyes Road Culvert Replacement” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Gardner, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Storm Sewer. Bids to Owner Public - Local October 29 at 01:00 PM (EDT)

Original sector

Transport

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Gardner

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Waste Processing and Treatment, Power Transmission, Road, Steel, Water Supply and Storage, Metal, Power Generation (CCGT), Rail, Cement, Government

Article published date

2026-10-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project