Keystone XL Crude Oil Pipeline

Sector: Consumer Products • Location: United States

Source: Hydrocarbon Technology

Project
Closed

Click here or on the image above to be taken to Keystone XL pipeline infographic – a crash course. Keystone XL Pipeline is a new 1,897km-long crude oil pipeline being developed by TransCanada. The cross-border pipeline will run from Hardisty in Canada to Steele City, Nebraska, and Texas in the US. The pipeline has a capacity to deliver 830,000bpd of crude oil and is expected to reduce greenhouse

Project Information FAQ

Project Information

3 Q
The project “Keystone XL Crude Oil Pipeline” is an infrastructure initiative in the Consumer Products sector, located in United States. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Click here or on the image above to be taken to Keystone XL pipeline infographic – a crash course. Keystone XL Pipeline is a new 1,897km-long crude oil pipeline being developed by TransCanada. The cross-border pipeline will run from Hardisty in Canada to Steele City, Nebraska, and Texas in the US. The pipeline has a capacity to deliver 830,000bpd of crude oil and is expected to reduce greenhouse gas emissions by 19 million metric tonnes. TransCanada is currently undertaking the permit procedure for the project, which will be completed by 2018. Construction for the Keystone XL pipeline project is expected to start in 2019. The project will help the US reduce its natural gas imports from the Middle East and Venezuela. It is expected to create approximately 20,000 jobs during the construction and operation phases. TheKeystone XL pipelinewas proposed by TransCanada in June 2008. The Presidential Permit application for the project was submitted to the US Department of State (DoS) in September 2008. The project received approval from the National Energy Board (NEB) of Canada in March 2010. The Final Environmental Impact Statement (FEIS) for the project was issued in August 2011. However, the Presidential Permit application was againdeniedby the DoS in January 2012 as the pipeline route was exploiting the Sand Hills region in Nebraska. TransCanada resubmitted the application in May 2012 by proposing a new route avoiding the Sand Hills of Nebraska. DoS evaluated the pipeline’s new proposed route and published the final Social and Environmental Impact study report in January 2014. The project failed to receive the Presidential Permit from the US Government and was put on hold. TransCanada applied for Keystone XL pipeline route approval in Nebraska in February 2017, which was approved by Nebraska Public Service Commission (NPSC) in November 2017. TransCanada finally received Presidential Permit in March 2017 to begin the project. Keystone XL pipeline aims to supply crude oil from the Western Canadian Sedimentary Basin (WCSB) in Canada and the Bakken Shale Formation in the US to existing Keystone Pipeline in Steele City, Nebraska, and Texas. The Canadian portion of the Keystone XL Pipeline will include a 529km-long pipeline segment. The pipeline will originate at the Hardisty terminal and continue through Alberta, towards the south, before entering in the Canadian-US border at Monchy in Saskatchewan. It will enter the US at Morgan on Montana’s border and pass through South Dakota, as well as Nebraska, where it will be connected to the existing Keystone Pipeline at Steele City. Keystone XL pipeline construction will involve burial of 36in diameter segments with a minimum depth of cover of 2m. The pipeline will have a permanent right-of-way with a width of 15m. The operating pressure for Keystone XL pipeline will be 1,308psig (pound force per inch). An 18m space will be left as a temporary workspace. Additional temporary work space will be created to ensure smooth pipeline construction at road and rail crossings, existing pipeline corridors, river crossings and other major locations. Inspection of all welds will be carried out using non-destructive examination equipment. Piping used in the project will be covered with a corrosion-resistant protective coating. The pipeline sections will be pressure-tested with water before operations start. The project will implement environmental protection plans to re-establish the vegetation on the passage once construction is complete. There will be above-ground facilities to support the pipeline operation. The above ground infrastructure will include 30 pump stations to ensure the free flow of crude oil through the pipeline and 112 mainline valves. The project will also involve construction of an alternative terminal and delivery points. Tank farms covering 74 acres will be constructed at Cushing and Oklahoma delivery points. Keystone XL will have an initial capacity of 700,000bpd with a further capacity to transport 830,000bpd. The pipeline will increase the total capacity of Keystone Pipeline to 1.3Mbpd. The pipeline will be continuously monitored using supervisory control and data acquisition (SCADA) and leak detection systems. Pumps and valves will be remotely controlled from a computerised control centre, manned 24 hours a day. The pipeline will be equipped with 21,000 data transmitters for observing the pressure and oil flow. The debate over whether the US President should approve TransCanada’s proposed 835 mile Keystone XL Pipeline has divided the nation. TransCanada’s proposed 835 mile Keystone XL Pipeline has divided a nation, but how do the facts stack up?

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data