logo

Khagaria Purnea Highway Project Limited

Sector: Tunnel • Location: India

Source: World Bank Group

Project
Active

In February 2011, the National Highway Authority of India (NHAI) awarded a 17-year concession (including construction period of 910 days) to Punj Lloyd Infrastructure Limited for the strengthening, improvement,2-laning, operation and maintenance of 140 kms (from KM 270.00 to KM 410.00) of Purnea to Khagaria section of National Highway-31 (NH-31) in the state of Bihar.

Under the contract, Punj Llo

Status
Prospective
Sector
Tunnel, Road, Bridge, Government, Waste Processing and Treatment, Automotive, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Khagaria Purnea Highway Project Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Khagaria Purnea Highway Project Limited” is an infrastructure initiative in the Tunnel sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In February 2011, the National Highway Authority of India (NHAI) awarded a 17-year concession (including construction period of 910 days) to Punj Lloyd Infrastructure Limited for the strengthening, improvement,2-laning, operation and maintenance of 140 kms (from KM 270.00 to KM 410.00) of Purnea to Khagaria section of National Highway-31 (NH-31) in the state of Bihar. Under the contract, Punj Lloyd was responsible for the design, construction, finance, operation and maintenance and strengthening and widening of the existing passageway to a 2-lane highway with paved shoulders. The scope would include construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, tunnels, viaducts, culverts, road intersections, interchanges, drains, etc.The expansion project, part of National Highway Development Project Phase -III was expected to give significant stimulus to trade and commerce in the entire region. Punj Lloyd Limited established Khagaria Purnea Highway Project Limited, a special purpose vehicle, to implement the project. The SPV won the tender through international competitive bidding, conducted by NHAI, by requesting the lowest fixed annuity of US$ 23.8 million (INR 1120 million @ 47 INR/USD). Under the contract, the SPV was to recover the capital costs and operating costs including returns through fixed semi-annual payment of INR 560mn from NHAI during the term of concession.The SPV had awarded a fixed-price, fixed-time EPC contract to Punj Lloyd Limited. The concession agreement was signed on 6th June 2011. The project attained financial closure on 4th October 2011.The estimated capital cost of the project at the time of financial closure was US$ 158.7 (INR 7548.9 mn @ 47 INR/USD) million. The debt equity ratio of the project was estimated at 83:17. Financing comprised of INR 6268.9mn debt and INR 1190mn sponsor equity. Debt was further split into an INR 4260mn 15-year term loan, USD 36.36mn 8-year term loan and INR 300mn 15-year term loan. The INR 4260mn term loan had a grace period of 6 months and had a repayment schedule of 25 semi-annual instalments. The pricing was floating linked to base rates of then banks. The INR 300mn term loan had a grace period of 7 years and had a repayment schedule of 13 semi-annual instalments. The loan was priced at prime lending rate of 15.75% with negative margin of 2.25%. The US$ 36.36mn term laon had a grace period of 6 months and had a repayment schedule of 11 semi-annual instalments. The USD loan was priced at 420bp above LIBOR. Mandated lead arrangers was State Bank of India with the following participants: L&T Infrastructure Finance Co. Ltd, ICICI Bank, Oriental Bank of Commerce, IIFCL, Indian Overseas Bank, and State Bank of Bikaner & Jaipur Construction on the project began in October 2011 and was expected to be completed by April 2014.

Original sector

Transport

Procurement method

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Tunnel, Road, Bridge, Government, Waste Processing and Treatment, Automotive, Commercial

Article published date

2024-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project