logo

KHAIRPUR IRRIGATION

Sector: Water Supply and Storage • Location: Pakistan

Source: World Bank Group

Project
Closed

The West Pakistan Khairpur Ground Water and Salinity Control Project consists of the draining and desalinization of a gross area of 355,000 acres by means of tubewells and a surface drain disposal system. The project is to provide drainage to control waterlogging and salinity in the Khairpur irrigation area. The work of the project, to be constructed over 3 years, will consist of: the installation

Status
Closed
Sector
Water Supply and Storage, Fertilizers, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government
Location
Pakistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about KHAIRPUR IRRIGATION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “KHAIRPUR IRRIGATION” is an infrastructure initiative in the Water Supply and Storage sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The West Pakistan Khairpur Ground Water and Salinity Control Project consists of the draining and desalinization of a gross area of 355,000 acres by means of tubewells and a surface drain disposal system. The project is to provide drainage to control waterlogging and salinity in the Khairpur irrigation area. The work of the project, to be constructed over 3 years, will consist of: the installation and equipment of about 568 tubewells spaced over 355,000 acres of the Khairpur area, including 250,000 acres of present cropland; the construction of seven surface drain disposal systems to convey pumped water from well sites to major watercourses; the installation of seven pumping plants to lift the water collected by these systems into the watercourses; the construction of regulators, bridges, and culverts in connection with the drains; and the extension of the main power transmission line by about 15 miles and the erection of power distribution lines from the main line to tubewell sites and the installation of transformers. The objective will be the lowering of the groundwater level to a minimum of seven feet below surface by pumping from the tubewells. The salt concentrations in surface soils will be leached to lower depths by heavy irrigation applications and removed from the area in solution in the pumped drainage water. The attainment of these objectives will result in the reclamation of abandoned land and a consequent increase in the crop area.

Original sector

Agriculture, Fishing and Forestry

Location

Country

Pakistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Fertilizers, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project