KHANABAD IRRIGATION II
Closed · Afghanistan
Source: World Bank Group
The proposed project aims to develop agriculture by rehabilitating and extending existing irrigation and drainage schemes, extending agriculture credit to farmers and providing an efficient extension service. It also aims at controlling malaria in the project area, and includes a feasibility study for a dam about 90 km upstream of the project area for water resources development. It aims to increa
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Hydro, Raw Materials, Government
- Location
- Afghanistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about KHANABAD IRRIGATION II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project aims to develop agriculture by rehabilitating and extending existing irrigation and drainage schemes, extending agriculture credit to farmers and providing an efficient extension service. It also aims at controlling malaria in the project area, and includes a feasibility study for a dam about 90 km upstream of the project area for water resources development. It aims to increase agricultural productivity and production on about 41,500 ha and to benefit about 12,000 families. Absolute rural poverty level in Afghanistan is currently estimated at US$84 per capita. After the implementation of the first Khanabad project 55 percent of the project farmers will still be in absolute poverty. These would be addressed by the proposed project. Within 9 years the project would increse average income of owner operators by 40 percent and sharecroppers by 20 percent. A risk exists that the extension service might not become fully effective by 1982 and that there would be some shortfall in the maximum projected yield. The project, however, would still be viable even if an effective extension service were significantly delayed or hampered. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Afghanistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Hydro, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Afghanistan
- Aggreko Kandahar Temporary Power Station
- Chimtala Substation A Terminal Link of Afghanistans North East Power System
- Gawargan And Chardarrah Agricultural Development
- Seraj Agricultural Development
- Kajakai Floodgate and Flood Control Scheme
- Clean Water Supply Networks in Helmand
- Developing and Implementing Private Sector Projects in Fragile and Conflict-Affected Situations and Small Island Developing States
- Implementing the Central Asia Regional Economic Cooperation 2030 Strategy for Sustainable Regional Development
