KHANABAD IRRIGATION II
Sector: Water Supply and Storage • Location: Afghanistan
Source: World Bank Group
The proposed project aims to develop agriculture by rehabilitating and extending existing irrigation and drainage schemes, extending agriculture credit to farmers and providing an efficient extension service. It also aims at controlling malaria in the project area, and includes a feasibility study for a dam about 90 km upstream of the project area for water resources development. It aims to increa
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed project aims to develop agriculture by rehabilitating and extending existing irrigation and drainage schemes, extending agriculture credit to farmers and providing an efficient extension service. It also aims at controlling malaria in the project area, and includes a feasibility study for a dam about 90 km upstream of the project area for water resources development. It aims to increase agricultural productivity and production on about 41,500 ha and to benefit about 12,000 families. Absolute rural poverty level in Afghanistan is currently estimated at US$84 per capita. After the implementation of the first Khanabad project 55 percent of the project farmers will still be in absolute poverty. These would be addressed by the proposed project. Within 9 years the project would increse average income of owner operators by 40 percent and sharecroppers by 20 percent. A risk exists that the extension service might not become fully effective by 1982 and that there would be some shortfall in the maximum projected yield. The project, however, would still be viable even if an effective extension service were significantly delayed or hampered. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in Afghanistan
- Chimtala Substation A Terminal Link of Afghanistans North East Power System
- Aggreko Kandahar Temporary Power Station
- Seraj Agricultural Development
- Seraj Agricultural Development
- Seraj Agricultural Development
- Kajakai Floodgate and Flood Control Scheme
- Kajakai Floodgate and Flood Control Scheme
- Kajakai Floodgate and Flood Control Scheme
