logo

KHANABAD IRRIGATION II

Sector: Water Supply and Storage • Location: Afghanistan

Source: World Bank Group

Project
Closed

The proposed project aims to develop agriculture by rehabilitating and extending existing irrigation and drainage schemes, extending agriculture credit to farmers and providing an efficient extension service. It also aims at controlling malaria in the project area, and includes a feasibility study for a dam about 90 km upstream of the project area for water resources development. It aims to increa

Project Information FAQ

Project Information

5 Q
The project “KHANABAD IRRIGATION II” is an infrastructure initiative in the Water Supply and Storage sector, located in Afghanistan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project aims to develop agriculture by rehabilitating and extending existing irrigation and drainage schemes, extending agriculture credit to farmers and providing an efficient extension service. It also aims at controlling malaria in the project area, and includes a feasibility study for a dam about 90 km upstream of the project area for water resources development. It aims to increase agricultural productivity and production on about 41,500 ha and to benefit about 12,000 families. Absolute rural poverty level in Afghanistan is currently estimated at US$84 per capita. After the implementation of the first Khanabad project 55 percent of the project farmers will still be in absolute poverty. These would be addressed by the proposed project. Within 9 years the project would increse average income of owner operators by 40 percent and sharecroppers by 20 percent. A risk exists that the extension service might not become fully effective by 1982 and that there would be some shortfall in the maximum projected yield. The project, however, would still be viable even if an effective extension service were significantly delayed or hampered.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data