logo

Khanapur Wind Farm

Sector: Consumer Products • Location: Jammu and Kashmir, India

Source: World Bank Group

Project
Active

Khanapur Wind Farm is a 100MW facility located in Maharashtra state, India. Gamesa will supply wind turbines in two phases.

Orange Maha Wind Energy Private Limited is wholly owned by Orange Renewable Power Group (100%) a subsidy of AT Holding Private Limited (Singapore).

It is a requirement that the facility be operational before a PPA can be signed, thus a PPA has yet to be signed.

Orange Maha

Status
Prospective
Sector
Consumer Products, Wind, Power Generation (CCGT), Raw Materials, Commercial, Government
Location
Jammu and Kashmir, India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Khanapur Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Khanapur Wind Farm” is an infrastructure initiative in the Consumer Products sector, located in Jammu and Kashmir, India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Khanapur Wind Farm is a 100MW facility located in Maharashtra state, India. Gamesa will supply wind turbines in two phases. Orange Maha Wind Energy Private Limited is wholly owned by Orange Renewable Power Group (100%) a subsidy of AT Holding Private Limited (Singapore). It is a requirement that the facility be operational before a PPA can be signed, thus a PPA has yet to be signed. Orange Maha Wind Energy Private Limited reach financial closure in January, 2015. Of the expected $124m USD cost, $37.35m USD will be financed through equity (Orange Renewable Holding Private Limited), and $86.65m USD will be debt financed (State Bank of India). Phase I of Khanapur Wind Farm was scheduled to be completed in March, 2015, and Phase II commissioned by June, 2015. As noted before the project is waiting on a PPA. When project is completed look for PPA Sources: Orange Renewable Power Group: http://www.orangerenewable.net/wind.html IJ Global: https://ijglobal.com/data/transaction/33691/khanapur-wind-farm-100mw News Articles: http://www.indiainfoline.com/article/print/news-sector-power/gamesa-india-signs-100-mw-wind-power-project-in-maharashtra-115012100436_1.html http://www.indiainfoline.com/article/news-sector-power/gamesa-india-signs-100-mw-wind-power-project-in-maharashtra-115012100436_1.html http://www.renewableenergyheadlines.com/index.php?option=com_k2&view=item&id=5909:spain-s-gamesa-bags-100-mw-wind-power-project-in-maharashtra&Itemid=271

Original sector

Energy

Budget

Location

Country

India

State

Jammu and Kashmir

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Consumer Products, Wind, Power Generation (CCGT), Raw Materials, Commercial, Government

Article published date

2024-05-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project