logo

Khandwa Water Supply Augmentation Project

Sector: Water Supply and Storage • Location: India

Source: World Bank Group

Project
Active

On February 11, 2009 Khandwa Municipal Corporation (KMC) signed a 25 year concession agreement with Vishwa Infrastructure and Services Limited for development and operation of a Water Supply Scheme in Khandwa town, East Nimar district, located in the state of Madhya Pradesh. Project includes bringing Narmada (river) water at a distance of 52 km from the Choti Tawa River (back water of Indira Sagar

Project Information FAQ

Project Information

4 Q
The project “Khandwa Water Supply Augmentation Project” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On February 11, 2009 Khandwa Municipal Corporation (KMC) signed a 25 year concession agreement with Vishwa Infrastructure and Services Limited for development and operation of a Water Supply Scheme in Khandwa town, East Nimar district, located in the state of Madhya Pradesh. Project includes bringing Narmada (river) water at a distance of 52 km from the Choti Tawa River (back water of Indira Sagar Project near Charkhera village) to Khandwa. The concession included setting up 56 MLD intake well, 42 MLD water treatment plant (the project is designed for 42 MLD, six hours of water supply), raw water pumping stations, clear water pumping main, electric sub stations, feeder mains, 10 over head tank to ensure 24x7 water supply, and distribution network for the project on a Design-Build-Finance-Operate-Transfer (DBFOT) basis along with operation and maintenance of the water supply system for the entire concession period of 25 years. The concession was awarded through competitive bidding. Five EOIs had been received and were shortlisted by KMC. It was agreed that there shall be no commission of any parallel competing facility whether by way of construction of new facility or augmentation of existing facility for a period of 25 years from appointed date. Vishwa Infrastructure and Services Limited won the concession by quoting the lowest retail water charges to be collected from consumers of Rs 11. 95 per kilo liter for the base year. Post-Commercial Operation Date(COD), concessionaire shall have the sole and exclusive right to demand, collect and appropriate charges as per concession agreement. O&M reimbursement to the concessionaire will be USD 1.55 Million per annum. The initial estimated project cost at the time of bidding was USD 21.78 Million. Post bidding, KMC approved an investment cost of about USD 23.53 Million. The funding support was expected to include grant from the Government – (i) UIDSSMT Scheme of Government of India (74%) of USD 17.43 Million, and (ii) Government of Madhya Pradesh (9.3%) of USD 2.18 Million. The balance fund (16.7%) of USD 3.93 Million shall be brought in by the Concessionaire. The company was expected to start supplying 29 MLD water from 2010.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data