logo

KHARSIA- NAYA RAIPUR-PARMALKASA 5th and 6th Line [278KM]

Sector: Road • Location: Bilaspur, Chhattisgarh, India

Source: India Investment Grid (IIG)

Project
Notice To Proceed

Information CAO/C/SECR has come up with KHARSIA- NAYA RAIPUR-PARMALKASA 5th and 6th Line [278KM] with a ticket size of 7853.84 INR Crores. This project in Railway Track sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The project line originates from Kharsia station on the Bilaspur-Jharsu

Project Information FAQ

Project Information

5 Q
The project “KHARSIA- NAYA RAIPUR-PARMALKASA 5th and 6th Line [278KM]” is an infrastructure initiative in the Road sector, located in Bilaspur, Chhattisgarh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

notice to proceed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information CAO/C/SECR has come up with KHARSIA- NAYA RAIPUR-PARMALKASA 5th and 6th Line [278KM] with a ticket size of 7853.84 INR Crores. This project in Railway Track sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The project line originates from Kharsia station on the Bilaspur-Jharsugda Line to Parmalkasa on the Bilaspur-Nagpur Line, passing through 8 districts [Raigarh, Janjgir-Champa, Sakti, Bilaspur, Baloda Bazar, Raipur, Durg, and Rajnandgaon] of Chhattisgarh State. The entire land for the project is to be acquired. The land width requirement varies as per the height of embankment and cutting required for formation and has been considered as per the code for the Engineering Department. About 1715.85 Hectares of land [Private, Government] is required for the project. There are 21 stations in this project connecting all major towns and villages. In this Project, there are 03 Important Bridges, 45 Major Bridges, 349 Minor Bridges, 5 Rail Over Rail flyovers,14 Road over bridges, and 184 RUB/LHS for crossing village roads.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data