Khavda-II Solar PV Project Phase 5
Sector: Power Generation (CCGT) • Location: Gujarat, India
Source: SolarQuarter
The fifth part capacity of 105 MW from the 1,200 MW Khavda-II Solar PV Project in Gujarat was commissioned and declared commercially operational from midnight on March 29, 2026. This project is developed under NTPC Renewable Energy Limited and contributes to NTPC Green Energy Limited's total operational capacity nearing 10 GW.
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar
- Location
- Gujarat, India
- Updated
- 22 Jul 2026
- Source
- SolarQuarter
ConstructChat
Ask ConstructChat about Khavda-II Solar PV Project Phase 5
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The fifth part capacity of 105 MW from the 1,200 MW Khavda-II Solar PV Project in Gujarat was commissioned and declared commercially operational from midnight on March 29, 2026. This project is developed under NTPC Renewable Energy Limited and contributes to NTPC Green Energy Limited's total operational capacity nearing 10 GW. |
Original sector | Energy |
Location
Country | India |
State | Gujarat |
Source
Source | SolarQuarter |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar |
Article published date | 2026-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
