logo

Khavda-II Solar PV Project Phase 5

Sector: Power Generation (CCGT) • Location: Gujarat, India

Source: SolarQuarter

Project
Completed

The fifth part capacity of 105 MW from the 1,200 MW Khavda-II Solar PV Project in Gujarat was commissioned and declared commercially operational from midnight on March 29, 2026. This project is developed under NTPC Renewable Energy Limited and contributes to NTPC Green Energy Limited's total operational capacity nearing 10 GW.

Status
Closed
Sector
Power Generation (CCGT), Solar
Location
Gujarat, India
Updated
22 Jul 2026
Source
SolarQuarter

ConstructChat

Ask ConstructChat about Khavda-II Solar PV Project Phase 5

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Khavda-II Solar PV Project Phase 5” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Gujarat, India. Taiyo aggregates data on it from SolarQuarter.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The fifth part capacity of 105 MW from the 1,200 MW Khavda-II Solar PV Project in Gujarat was commissioned and declared commercially operational from midnight on March 29, 2026. This project is developed under NTPC Renewable Energy Limited and contributes to NTPC Green Energy Limited's total operational capacity nearing 10 GW.

Original sector

Energy

Location

Country

India

State

Gujarat

Source

Source

SolarQuarter

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar

Article published date

2026-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project