logo

Khavda Renewable Energy Project

Sector: Wind • Location: India

Source: Whalesbook

Project
Operational With Ongoing Expansion Plans

Adani Green Energy Limited (AGEL) has added 4,613 MW renewable capacity at the Khavda project, which includes 9.4 GW of solar, wind, and hybrid projects along with 1,376 MWh of battery storage. The project is part of AGEL's overall operating capacity of 19.3 GW as of FY26, contributing to a five-year annual growth rate of 42%. AGEL plans to further invest ₹40,000–45,000 crore in FY27, including ex

Status
Under Construction
Sector
Wind, Energy Storage, Power Generation (CCGT), Solar
Location
India
Updated
22 Jul 2026
Source
Whalesbook

ConstructChat

Ask ConstructChat about Khavda Renewable Energy Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Khavda Renewable Energy Project” is an infrastructure initiative in the Wind sector, located in India. Taiyo aggregates data on it from Whalesbook.

Participants

Not available for this record.

Status

Original status

operational with ongoing expansion plans

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Adani Green Energy Limited (AGEL) has added 4,613 MW renewable capacity at the Khavda project, which includes 9.4 GW of solar, wind, and hybrid projects along with 1,376 MWh of battery storage. The project is part of AGEL's overall operating capacity of 19.3 GW as of FY26, contributing to a five-year annual growth rate of 42%. AGEL plans to further invest ₹40,000–45,000 crore in FY27, including expanding battery storage capacity to over 10 GWh with an investment of ₹15,000 crore to improve power supply consistency and reduce curtailment.

Original sector

Renewables

Budget

Location

Country

India

Source

Source

Whalesbook

URL

More Details

Record type

Project

Sector

Wind, Energy Storage, Power Generation (CCGT), Solar

Article published date

2026-05-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project