Khavda Renewable Energy Transmission System Phase-V Part C
Sector: Power Generation (CCGT) • Location: Gujarat, India
Source: Scanx
Establishment of a 2500 MW HVDC system connecting KPS III to South Olpad, spanning approximately 1200 circuit kilometers, designed to facilitate the evacuation of 2.5 GW of renewable energy as part of Phase-V scheme to enable evacuation of 8 GW RE power from Khavda RE park in Gujarat.
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Gujarat, India
- Updated
- 22 Jul 2026
- Source
- Scanx
ConstructChat
Ask ConstructChat about Khavda Renewable Energy Transmission System Phase-V Part C
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Establishment of a 2500 MW HVDC system connecting KPS III to South Olpad, spanning approximately 1200 circuit kilometers, designed to facilitate the evacuation of 2.5 GW of renewable energy as part of Phase-V scheme to enable evacuation of 8 GW RE power from Khavda RE park in Gujarat. |
Original sector | Energy |
Location
Country | India |
State | Gujarat |
Source
Source | Scanx |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
