Khavda Solar Energy Project Phase 3
Sector: Solar • Location: Bhuj, Gujarat, India
Source: India Infoline
NTPC Renewable Energy has commissioned an additional 49.1 MW capacity at its 300 MW Khavda solar energy project located in Bhuj, Gujarat. This is the third phase of the project, part of the 450 MW hybrid tranche V project. The first phase of 142.20 MW was commissioned on June 28, 2025, and the second phase of 32.80 MW on June 30, 2025.
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT)
- Location
- Bhuj, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- India Infoline
ConstructChat
Ask ConstructChat about Khavda Solar Energy Project Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NTPC Renewable Energy has commissioned an additional 49.1 MW capacity at its 300 MW Khavda solar energy project located in Bhuj, Gujarat. This is the third phase of the project, part of the 450 MW hybrid tranche V project. The first phase of 142.20 MW was commissioned on June 28, 2025, and the second phase of 32.80 MW on June 30, 2025. |
Original sector | Energy |
Location
Country | India |
State | Gujarat |
City | Bhuj |
Source
Source | India Infoline |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
