logo
ProjectActive

Khed Sinnar Expressway Limited

One of 10,000+ projects Taiyo tracks in India.

Source: World Bank Group

In March 2013, the National Highway Authority of India (NHAI) awarded a 20-year concession (including construction period of 910 days which was about 2.5 years) to ILFS Transportation Networks Limited (ITNL) for the strengthening, improvement, 4-laning, operation and maintenance, and tolling of 137.946kms (from KM42.000 to KM177.000 including a bypass section of 31.78kms) of Khed to Sinnar section

Status
Prospective
Sector
Road, Waste Processing and Treatment, Bridge, Government, Manufacturing (Industrial), Residential, Automotive, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Khed Sinnar Expressway Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Khed Sinnar Expressway Limited” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In March 2013, the National Highway Authority of India (NHAI) awarded a 20-year concession (including construction period of 910 days which was about 2.5 years) to ILFS Transportation Networks Limited (ITNL) for the strengthening, improvement, 4-laning, operation and maintenance, and tolling of 137.946kms (from KM42.000 to KM177.000 including a bypass section of 31.78kms) of Khed to Sinnar section of National Highway-50 (NH50),in the state of Maharashtra. Under the contract, ITNL was responsible for the design, construction, finance,operation and maintenance and widening of the existing 2-lane carriageway to a 4-lane highway with paved shoulders. The scope included construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections, interchanges, drains, etc. The expansion project, part of National Highway Development Project Phase-IVB would ease traffic congestion and give significant stimulus to trade and commerce in the entire region.Khed - Sinnar section of was proposed as a part of Delhi Mumbai Industrial corridor and thus was considered an important link. NH-50 is a link between NH-3 in Maharashtra and shall be giving feeder service to Golden Quadrilateral (GQ) 4 at Pune city. ILFS Transportation Networks Limited established Khed Sinnar Expressway Limited (KSEL), a special purpose vehicle, to implement the project. The SPV won the tender through international competitive bidding, conducted by NHAI, by requesting the lowest upfront subsidy of US$ 50.6mn (INR 2966mn @58.6 INR/USD). Out of the 40 pre-qualified bidders, 4 developers participated in the final bid. Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession. The concession agreement for the project was signed on 8th May 2013. The project attained financial closure on 1st November 2013. The grant/debt/equity ratio for the project was 15/66/19. The estimated capital cost of the project at the time of financial closure was US$ 341.3mn (INR 20000mn @58.6 INR/USD). Apart from viability gap funding (grant) of INR 2966mn, financing comprised of a 14-year 9-months term loan of US$ 226.1mn (INR 13250mn) and sponsor equity of US$ 64.6mn (INR 3784mn).The debt was solely arranged by Yes Bank Limited. Construction on the project was expected to begin in November 2013 (this was the assigned appointment date post signing of concession agreement in May 2013 and financial closure in November 2013) and be completed by May 2016.

Original sector

Transport

Procurement method

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Waste Processing and Treatment, Bridge, Government, Manufacturing (Industrial), Residential, Automotive, Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project