Khizi-Absheron Wind Power Plant
Sector: Power Generation (CCGT) • Location: Gobustan, Azerbaijan
Source: Azer News
The Khizi-Absheron Wind Power Plant is a wind energy project with 12 wind turbines installed in Gobustan, currently operating in test mode. The turbine blades have been activated and are undergoing trial operations. The plant is scheduled to be commissioned by the end of 2025.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Wind
- Location
- Gobustan, Azerbaijan
- Updated
- 22 Jul 2026
- Source
- Azer News
ConstructChat
Ask ConstructChat about Khizi-Absheron Wind Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Khizi-Absheron Wind Power Plant is a wind energy project with 12 wind turbines installed in Gobustan, currently operating in test mode. The turbine blades have been activated and are undergoing trial operations. The plant is scheduled to be commissioned by the end of 2025. |
Original sector | Energy |
Location
Country | Azerbaijan |
City | Gobustan |
Source
Source | Azer News |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
