logo
ProjectCompleted

Khulna Power Project

Sector: Waste Processing and Treatment • Location: Bangladesh

Source: International Finance Corporation (IFC)

Summary Of Project Information (SPI)Project NameBangladesh - Khulna Power Project     RegionAsiaSectorProject No008750Projected Board DateMay 28, 1998Company NameKhulna Power Company, Ltd.Technical Partner and/or Major Shareholders Major Shareholder is Wartsila NSD Power DevelopmentProject Cost Including proposed IFC investment US$108 million, including an IFC A Loan of US$23.5 million, a B Loan o

Status
Closed
Sector
Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Water Supply and Storage, Geothermal, Natural Gas, Government, Oil and Gas, Biomass
Location
Bangladesh
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Khulna Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Khulna Power Project” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Bangladesh. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Summary Of Project Information (SPI)Project NameBangladesh - Khulna Power Project     RegionAsiaSectorProject No008750Projected Board DateMay 28, 1998Company NameKhulna Power Company, Ltd.Technical Partner and/or Major Shareholders Major Shareholder is Wartsila NSD Power DevelopmentProject Cost Including proposed IFC investment US$108 million, including an IFC A Loan of US$23.5 million, a B Loan of US$37 million and equity of US$3.3 million.Location of project and Description of site The project is located near the city of Khulna, the third largest city in Bangladesh. The project site is a vacant property situated on the bank of the Bhairab River, and is adjacent to an existing power station and an oil tank farm.Description of Company and Purpose of Project The project consists of a 110 MW power plant to be developed under a build, own, operate scheme. The project would initially run on residual fuel oil, to be converted to natural gas as soon as it is available. The electricity to be produced will be sold to the Bangladesh Power Development Board, the national utility, on the basis of a 15 year PPA. The project will be one of the first IPPs to be implemented under the new Government of Bangladesh guidelines for private power projects. At about 80 kWh, Bangladesh is among the lowest in developing countries in terms of electricity generated per capita, and its distribution network serves only about 15% of the population. As Bangladesh has enjoyed steady growth in recent years, the infrastructure to supply electricity to the economy has not kept pace with this growth. Reliability of electricity supply, which has been a growing problem over the years, has now reached crisis proportions. Peak demand is about 2700 MW, whereas available generation is about 2000 MW. The demand supply imbalance has now become a major bottleneck to economic growth. The Khulna power project, which is expected to be completed within 12 months, is a fast-track response to the power shortage situation. IFC''s participation in the project, including its proposed B Loan umbrella protection, is critical to mobilize adequate debt financing from the market. Environmental Category and Issues This is an environmental review category B project. Environmental and social issues associated with the project include: site selection and land use, site contamination from past activities, air emissions and noise from construction and plant operation, liquid effluents, liquid and solid waste disposal, oil transportation safety and spill potential, social impacts, fire prevention and emergency response, employee health and safety programs, and impact management and monitoring. KPC has prepared an environmental assessment for the project to address these issues and demonstrate that the proposed project will comply with applicable governmental and World Bank requirements. The proposed site for the project was identified by BPDB in their RFP for the project. The project is located on an uninhabited, vacant property owned by PADMA, the state oil company. No resettlement of residents or economic displacement was required.During operations the proposed power plant''s emissions will meet the World Bank emission guidelines. The predicted ambient pollutant levels contributed by the proposed power plant are within all Bangladesh standards and World Bank guidelines on a stand-alone basis. The site is adjacent to an existing power plant, and modeling of the emissions from the existing and proposed plants indicates that World Bank guidelines for ground level concentrations of SO2 (24 hour average) would be exceeded. Means to mitigate these relatively minor effects on ground level SO2 concentrations so that there will be no net decrease in ambient air quality are being further investigated by the sponsor. Noise monitoring will be carried out upon completion of the proposed plant to confirm compliance with recommended noise guidelines or recommend mitigation measures should they prove necessary. All effluents to water from the site are expected to comply with World Bank and Bangladesh guidelines.Socioeconomic impacts are largely beneficial ones, including the positive, short-term impact on employment and local businesses as a result of construction activities, the bringing of a reliable source of electricity to the area, and the establishing of a Social Goodwill Fund to be made available to the local community for its general benefit.The is from the Public Information Center.Date SPI sent to PIC      April 28, 1998“This Summary of Project Information is prepared and distributed to the public in advance of consideration of the proposed transaction by the Corporation’s Board of Directors. It is provided for the purpose of enhancing the transparency of IFC’s activities and should not be construed as presuming the outcome of IFC Board consideration.”For Additional Information contact: Corporate Relations Unit -telephone: (202) 473-7711facsimile: (202) 974-4384Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Original sector

AB - Gas - Thermal Power Generation

Location

Country

Bangladesh

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Water Supply and Storage, Geothermal, Natural Gas, Government, Oil and Gas, Biomass

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project