logo

Kiakkai bridge project approved in Thailand

Sector: Automotive • Location: Thailand

Source: SouthEast Asia Infrastructure (Thailand)

Project
Active

The proposed bridge across the Chao Phraya River to relieve traffic congestion surrounding the new parliament complex has been granted approval by a committee chaired by the Deputy Prime Minister of Thailand. The Kiakkai bridge will relieve traffic congestion on existing bridges, which can only handle 30,000 vehicles per hour compared to a daily traffic volume of nearly 36,000 per hour. The Bangko

Project Information FAQ

Project Information

3 Q
The project “Kiakkai bridge project approved in Thailand” is an infrastructure initiative in the Automotive sector, located in Thailand. Taiyo aggregates data on it from SouthEast Asia Infrastructure (Thailand).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed bridge across the Chao Phraya River to relieve traffic congestion surrounding the new parliament complex has been granted approval by a committee chaired by the Deputy Prime Minister of Thailand. The Kiakkai bridge will relieve traffic congestion on existing bridges, which can only handle 30,000 vehicles per hour compared to a daily traffic volume of nearly 36,000 per hour. The Bangkok Metropolitan Administration (BMA) has initially proposed the project after conducting a feasibility study and accounting for public input from stakeholders. The Kiakkai bridge is one of eight infrastructure projects aimed at alleviating traffic congestion around the complex. It will be part of a 5.9-km link is estimated to cost up to THB16 billion.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data