Kihansi Catchment Conservation and Management Project
Sector: Water Supply and Storage • Location: Tanzania
Source: World Bank Group
The objective of the Kihansi Catchment Conservation and Management Project for Tanzania is to enhance biodiversity conservation in the Kihansi catchment. The project has 3 components. (1) Institutional capacity building for the management of the Kihansi catchment component will develop operational guidelines and procedures to conduct Environmental Flow Assessment and develop options for a sustaina
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Raw Materials, Government
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Kihansi Catchment Conservation and Management Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Kihansi Catchment Conservation and Management Project for Tanzania is to enhance biodiversity conservation in the Kihansi catchment. The project has 3 components. (1) Institutional capacity building for the management of the Kihansi catchment component will develop operational guidelines and procedures to conduct Environmental Flow Assessment and develop options for a sustainable financing mechanism for ensuring the long-term conservation and management of the Kihansi catchment. (2) Conserve endangered species in the Kihansi catchment component will focus on operational level interventions in the Kihansi catchment to ensure that the natural habitats knowledge base for the ecosystems in Kihansi is improved, and that the catchment can be managed sustainably over the long term. (3) Project management component will focus on project coordination at national, district and community levels. It will support the implementing entities including NEMC and the Ministries for Water,Energy, Rufiji Basin Water Board, and LGAs with day-to-day project implementation and provision of basic project management support including, procurement, financial and environmental management and monitoring and evaluation. |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Tanzania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of soap and detergents, cleaning and polishing preparations, perfumes and toilet preparations/NCG CHEMICAL INDUSTRIES
- Dar es Salaam Water Distribution
- Silverlands Tanzania Limited
- Kahama Mining Corp. Ltd.
- Tabora Water Supply Scheme, Tanzania
