KIKINDA IRON FOUNDRY
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project includes: (a) Expansion and modernization of the malleable foundry, including two hot blast cupolas, four electric induction furnaces, two flaskless molding lines, one automatic molding line, two annealing furnaces and supporting facilities; (b) Expansion of the gray and nodular foundry, with four electric furnaces, one automatic molding line, one annealing furnace, and core-making fac
- Status
- Closed
- Sector
- Water Supply and Storage, Rail, Power Generation (CCGT), Manufacturing (Industrial), Steel, Metal, Government, Commercial
- Location
- Macedonia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about KIKINDA IRON FOUNDRY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes: (a) Expansion and modernization of the malleable foundry, including two hot blast cupolas, four electric induction furnaces, two flaskless molding lines, one automatic molding line, two annealing furnaces and supporting facilities; (b) Expansion of the gray and nodular foundry, with four electric furnaces, one automatic molding line, one annealing furnace, and core-making facilities, one heat treatment plant, one sand preparation plant and supporting facilities; (c) Expansion and modernization of the fitting finishing shop, including thirteen automatic machines, six lathes, one new galvanizing plant, one additional packing unit and supporting facilities; (d) Expansion and modernization of the machine tool plant including relocation of existing machines, replacement of old machines, addition of numerically-controlled machines and a climatized mounting room; (e) A new streamlined storage and materials handling system; (f) Expansion and modernization of the existing facilities for the distribution of electric power, gas, compressed air and water and the installation of one new gas-heated steam boiler; (g) Construction of a railroad connection to the public railroad system; and (h) Installation of equipment for dust and fume extraction. |
Original sector | (Historic)Industry |
Location
Country | Macedonia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail, Power Generation (CCGT), Manufacturing (Industrial), Steel, Metal, Government, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
