logo

KIKINDA IRON FOUNDRY

Sector: Water Supply and Storage • Location: Yugoslavia, former

Source: World Bank Group

Project
Closed

The project includes: (a) Expansion and modernization of the malleable foundry, including two hot blast cupolas, four electric induction furnaces, two flaskless molding lines, one automatic molding line, two annealing furnaces and supporting facilities; (b) Expansion of the gray and nodular foundry, with four electric furnaces, one automatic molding line, one annealing furnace, and core-making fac

Project Information FAQ

Project Information

5 Q
The project “KIKINDA IRON FOUNDRY” is an infrastructure initiative in the Water Supply and Storage sector, located in Yugoslavia, former. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project includes: (a) Expansion and modernization of the malleable foundry, including two hot blast cupolas, four electric induction furnaces, two flaskless molding lines, one automatic molding line, two annealing furnaces and supporting facilities; (b) Expansion of the gray and nodular foundry, with four electric furnaces, one automatic molding line, one annealing furnace, and core-making facilities, one heat treatment plant, one sand preparation plant and supporting facilities; (c) Expansion and modernization of the fitting finishing shop, including thirteen automatic machines, six lathes, one new galvanizing plant, one additional packing unit and supporting facilities; (d) Expansion and modernization of the machine tool plant including relocation of existing machines, replacement of old machines, addition of numerically-controlled machines and a climatized mounting room; (e) A new streamlined storage and materials handling system; (f) Expansion and modernization of the existing facilities for the distribution of electric power, gas, compressed air and water and the installation of one new gas-heated steam boiler; (g) Construction of a railroad connection to the public railroad system; and (h) Installation of equipment for dust and fume extraction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data