Kildrummie House / Ink Architects Sydney
Sector: Steel • Location: Australia
Source: ArchDaily
This building has no air conditioning. Hydronic heating is incorporated in the top layer of the slab, allowing room temperature management in the winter months. The builders have a wood frame and window fabrication shop. The Greensmith@co team prefabricated much of the building to minimize on-site time and provide better quality control.The building is oriented to relate to existing structures and
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This building has no air conditioning. Hydronic heating is incorporated in the top layer of the slab, allowing room temperature management in the winter months. The builders have a wood frame and window fabrication shop. The Greensmith@co team prefabricated much of the building to minimize on-site time and provide better quality control.The building is oriented to relate to existing structures and use passive solar energy. The use of solar panels to accumulate electrical energy in batteries to become totally independent from the urban grid. Rainwater is collected in subway ponds for potable use. All windows are thermopanel, including high-level louvers to allow the evacuation of temperate air in the summer season.Text description provided by the architects.This project starts with a commission from a wonderful Australian couple who like to host and entertain visitors and family. They own a piece of land in theHigh Range, located about 100 km south-west of Sydney that already contains a small dwelling but wanted to have a new pavilion with a bedroom, bathroom, living/dining/kitchen area that opens up to large covered but versatile areas that can be used throughout the four seasons.The brief was very specific with respect to the most advanced principles of sustainable architecture. They wanted to use recycled wood for the structure and the best sustainable technology available in 2024. We should not use aluminum or steel in its construction. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
