logo

Killarney Landfill Leachate Collection and Treatment System

Sector: Waste Processing and Treatment • Location: Ontario, Canada

Source: Infrastructure Canada

Project
In Progress

The Municipality has applied for approval of a landfill site expansion as required by the Environmental Compliance Approval (ECA) issued by the Ministry of the Environment (MOE). One of the conditions included in the ECA is that the municipality install a leachate collection and treatment system. A number of alternatives such as a constructed treatment plant were considered in addition to the desi

Project Information FAQ

Project Information

5 Q
The project “Killarney Landfill Leachate Collection and Treatment System” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Municipality has applied for approval of a landfill site expansion as required by the Environmental Compliance Approval (ECA) issued by the Ministry of the Environment (MOE). One of the conditions included in the ECA is that the municipality install a leachate collection and treatment system. A number of alternatives such as a constructed treatment plant were considered in addition to the design submitted for approval. This system included an installed leachate collection piping system and construction of a treatment lagoon within the wetland with controlled discharge. The municipality has submitted the design of the system to MOE as required and must commence installation following receipt of approval. The collection and treatment systems will be installed at the same time as required by the ECA.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data