Killawarra Solar Battery Hybrid Project
Sector: Energy Storage • Location: Kadathinni, Western Australia, Australia
Source: RenewEconomy
The Killawarra project is a proposed 400 MW solar farm combined with a 400 MW, 1,600 MWh integrated battery facility. It aims to tap into major new industrial and electrification loads in Western Australia, near the town of Kadathinni, about 300 kms north of Perth. The project intends to connect to the north-south 330kW transmission line running through the property.
- Status
- Prospective
- Sector
- Energy Storage, Raw Materials, Solar, Manufacturing (Industrial)
- Location
- Kadathinni, Western Australia, Australia
- Updated
- 22 Jul 2026
- Source
- RenewEconomy
ConstructChat
Ask ConstructChat about Killawarra Solar Battery Hybrid Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Killawarra project is a proposed 400 MW solar farm combined with a 400 MW, 1,600 MWh integrated battery facility. It aims to tap into major new industrial and electrification loads in Western Australia, near the town of Kadathinni, about 300 kms north of Perth. The project intends to connect to the north-south 330kW transmission line running through the property. |
Original sector | Energy |
Budget |
Location
Country | Australia |
State | Western Australia |
City | Kadathinni |
Source
Source | RenewEconomy |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Raw Materials, Solar, Manufacturing (Industrial) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
