logo
ProjectClosed

Killen Water Line Replacements Phase 2

Sector: Metal • Location: Florence, Alabama, United States of America

Source: Dodge USA

In general, the project includes approximately 8,400 feet of 3" PVC water main, 8,000 feet of 6" ductile iron water main, directional drilling, water service laterals, and water meter box assemblies

Status
Closed
Sector
Metal, Water Supply and Storage, Government, Steel, Commercial, Waste Processing and Treatment
Location
Florence, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Killen Water Line Replacements Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Killen Water Line Replacements Phase 2” is an infrastructure initiative in the Metal sector, located in Florence, Alabama, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In general, the project includes approximately 8,400 feet of 3" PVC water main, 8,000 feet of 6" ductile iron water main, directional drilling, water service laterals, and water meter box assemblies

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Florence

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Water Supply and Storage, Government, Steel, Commercial, Waste Processing and Treatment

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project