Kimbrough Street Sewer Water & Paving Replacement
Sector: Water Supply and Storage • Location: White Settlement, Texas, United States of America
Source: Dodge USA
This project is the full length of Kimbrough Street from Downe Drive to Sandell Drive. The project consists of approximately 5,744 LF of Water Line Replacement, 4,805 LF of Sanitary Sewer Line Replacement, 566 LF Storm Drain Extension, and approximately 15,292 SY of Paving Replacement.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- White Settlement, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Kimbrough Street Sewer Water & Paving Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is the full length of Kimbrough Street from Downe Drive to Sandell Drive. The project consists of approximately 5,744 LF of Water Line Replacement, 4,805 LF of Sanitary Sewer Line Replacement, 566 LF Storm Drain Extension, and approximately 15,292 SY of Paving Replacement. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | White Settlement |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
