Kincaid & Hamilton Intersection Realignment & Sidewalk
Sector: Water Supply and Storage • Location: Griffin, Georgia, United States of America
Source: Dodge
Project A Hamilton Boulevard Realignment The project consists of the demolition and relocation of approximately 386 linear feet of 24- foot-wide local street along with milling and new overlay of the remaining 1,259 linear feet of existing roadway. The street construction includes asphalt paving and concrete curb and gutter. Utility work on the project includes replacement of the existing 18-inch
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Road, Car parking, Commercial, Automotive, Government, Power Generation (CCGT), Cement, Manufacturing (Industrial)
- Location
- Griffin, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Kincaid & Hamilton Intersection Realignment & Sidewalk
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project A Hamilton Boulevard Realignment The project consists of the demolition and relocation of approximately 386 linear feet of 24- foot-wide local street along with milling and new overlay of the remaining 1,259 linear feet of existing roadway. The street construction includes asphalt paving and concrete curb and gutter. Utility work on the project includes replacement of the existing 18-inch storm pipe system and two catch basins and installation of approximately 1,661 linear feet of 12 ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Griffin |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Road, Car parking, Commercial, Automotive, Government, Power Generation (CCGT), Cement, Manufacturing (Industrial) |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
