Kinder Morgan Permian Highway Pipeline Maintenance
Sector: Wind • Location: Big Lake, Texas, United States
Source: BOE Report
Kinder Morgan is performing a turbine exchange at the Big Lake compressor station on the Permian Highway pipeline, reducing mainline capacity and causing gas supply constraints in the Permian basin. This maintenance is scheduled from May 13 to May 26, 2025.
- Status
- Under Construction
- Sector
- Wind, Natural Gas, Road, Warehouse
- Location
- Big Lake, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- BOE Report
ConstructChat
Ask ConstructChat about Kinder Morgan Permian Highway Pipeline Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under maintenance |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Kinder Morgan is performing a turbine exchange at the Big Lake compressor station on the Permian Highway pipeline, reducing mainline capacity and causing gas supply constraints in the Permian basin. This maintenance is scheduled from May 13 to May 26, 2025. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Texas |
City | Big Lake |
Source
Source | BOE Report |
URL |
More Details
Record type | Project |
Sector | Wind, Natural Gas, Road, Warehouse |
Article published date | 2025-05-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States
- Union Power Project El Dorado AR
- I-485 Charlotte Outer Loop, North Carolina
- Goethals Bridge Replacement Project, New York
- Northeast Supply Enhancement (NESE) Project
- Dominion Cove Point Liquefaction Project, Chesapeake Bay
- Starbucks Coffee Roasting Plant
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
