logo

King City Capital Preventative Maintenance

Sector: Cement • Location: King City, California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Proposed

Caltrans proposes to preserve the pavement on an 8-mile section of U.S. 101 near King City, between Jolon Road and Lagomarsino Avenue, in Monterey County. The project would implement preventative maintenance strategies to maintain the roadbed and improve ride quality as part of the 2020 State Highway Operation and Protection Program (SHOPP). The scope of work includes cold-planing the existing ope

Project Information FAQ

Project Information

5 Q
The project “King City Capital Preventative Maintenance” is an infrastructure initiative in the Cement sector, located in King City, California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Caltrans proposes to preserve the pavement on an 8-mile section of U.S. 101 near King City, between Jolon Road and Lagomarsino Avenue, in Monterey County. The project would implement preventative maintenance strategies to maintain the roadbed and improve ride quality as part of the 2020 State Highway Operation and Protection Program (SHOPP). The scope of work includes cold-planing the existing open grade friction course pavement and placing a 0.15-foot rubberized hot mix asphalt overlay, replacing or rehabilitating three drainage culverts, adding three new street lights at the Jolon Road interchange, and replacing a weigh-in-motion station (in Greenfield) and traffic census stations. Other improvements include upgrading guardrail and guardrail end treatments, vegetation control, and doing minor concrete, shoulder backing and pavement dig outs. The existing pavement was constructed in 1956. Since then, pavement rehabilitation improvement projects have been limited to repair with thin, new wear courses, most recently in 2011. The pavement wear course, if not replaced, will degrade to a point where water intrusion would result in failure of the underlying layers, leading to more costly reconstruction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data