logo

King County Everest Park Restroom Replacement

Sector: Steel • Location: Kirkland, Washington, United States of America

Source: Dodge

Project
Closed

The Project consists of all work to be performed as indicated in the Project Manual, Drawings and posted Addenda. The work consists of all labor, materials, and other incidentals for construction including but not limited to the demolition of an existing 1,070 SF 60-yr old restroom replacing it with the construction of a new more modern building. The new facility will include additional stalls in

Status
Closed
Sector
Steel, Government, Car parking, Automotive, Manufacturing (Industrial), Commercial
Location
Kirkland, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about King County Everest Park Restroom Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “King County Everest Park Restroom Replacement” is an infrastructure initiative in the Steel sector, located in Kirkland, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of all work to be performed as indicated in the Project Manual, Drawings and posted Addenda. The work consists of all labor, materials, and other incidentals for construction including but not limited to the demolition of an existing 1,070 SF 60-yr old restroom replacing it with the construction of a new more modern building. The new facility will include additional stalls in the mens and womens restrooms and two family style gender neutral restrooms. The Project area is ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Kirkland

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Steel, Government, Car parking, Automotive, Manufacturing (Industrial), Commercial

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project