logo

King Fahd Causeway

Sector: Automotive • Location: World

Source: Road Traffic Technology

Project
Closed

The King Fahd causeway is a 25km long causeway crossing the Gulf of Bahrain. Satellite image of the King Fahd causeway. The 25km-long King Fahd causeway links the Kingdom of Bahrain with the Eastern region of the Kingdom of Saudi Arabia. Crossing the Gulf of Bahrain, in the Persian Gulf, the causeway starts in Saudi Arabia at Al-Aziziyyah, south of Alkhobar, and extends up to Al-Jasra, west of Man

Project Information FAQ

Project Information

5 Q
The project “King Fahd Causeway” is an infrastructure initiative in the Automotive sector, located in World. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The King Fahd causeway is a 25km long causeway crossing the Gulf of Bahrain. Satellite image of the King Fahd causeway. The 25km-long King Fahd causeway links the Kingdom of Bahrain with the Eastern region of the Kingdom of Saudi Arabia. Crossing the Gulf of Bahrain, in the Persian Gulf, the causeway starts in Saudi Arabia at Al-Aziziyyah, south of Alkhobar, and extends up to Al-Jasra, west of Manama in Bahrain. It comprises two segments, a longer bridge from Khobar to Nasan Island in Bahrain and a shorter stretch from Nasan Island to the main island of Bahrain. The $1.2bn project was officially launched to public in 1986. On an average, it serves about 45,000 vehicles a day that increases to about 60,000 vehicles during weekends. It was used by 17.7 million passengers in 2008. The causeway was built by Dutch contractor Ballast Nedam and financed entirely by the Kingdom of Saudi Arabia and King Fahd Causeway Authority (KFCA) is the operator. A $5m expansion to the causeway was announced in July 2010. The expansion aims to increase the departure and arrival lanes on both sides of the causeway. The causeway is a four-lane road featuring two roadways. Each roadway is 11.6m wide and includes two lanes running in opposite directions. It features a curb for emergency parking. There are five bridges, totalling 12.43km in length, along the route of the entire causeway. The first three bridges measure 934m, 2,034m and 5,194m in length and form part of the Saudi side. The Bahraini side of the causeway contains two bridges measuring 3,334m and 934m in length. The bridges are interconnected by islands and dams. Approximately 12.5km of the causeway has been constructed as a dam. The causeway also comprises seven embankments extending 12.57km in length. A 660,000m² border station at embankment no. 4 is the largest among all. Designed as two connected islands, the border station includes two mosques, two 65m high tower restaurants, buildings of KFCA and other government directorates and two coastguard towers. The island on the west side is designated to Saudi Arabia while that on the east side is designated to Bahrain. The expansion project is part of a larger SAR1.07bn ($284.8m) causeway development project plan that aims to increase the number of lanes dramatically. The project will involve the construction of two 400,000m² artificial islands, one on either side of the causeway. Approximately SAR998m will be used for the construction of the islands, associated infrastructure, buildings and other facilities. A waiting yard with a capacity for 400 trucks will also be constructed at either end of the causeway. The expansion will add seven new departure lanes and five new arrival lanes, bringing the total number of departure and arrival lanes to 17 and 18 respectively. A new commercial centre is currently being renovated on the Bahraini side. The centre will include a number of restaurants, coffee shops, a grocery shop, telephone stalls and a shop for the travelers to meet. It is expected to be completed by the first quarter of 2011. A health centre to accommodate an emergency room and an ambulance is also under construction on the Bahrain side. A similar health centre will be constructed on the Saudi side. At the Bahraini entrance, a security checkpoint will be installed. Utilities including washrooms and mosques will also be expanded on both sides of the causeway as part of the project. The expansion will increase the passenger handling capacity of the causeway to 100 million a year. The construction is expected to begin in 2012 with scheduled completion by December 2015. The causeway was constructed between 1982 and 1986. It involved the installation of over 500 pre-stressed concrete cylinder piles beneath and along the causeway. The piles are 3.5m in diameter and have been installed and grouted into drilled sockets. In order to suit the geotechnical conditions, the length of the piles was changed from bent to bent. Approximately 350,000m² of concrete was used along with 47,000t of reinforced steel. To avoid corrosion of the reinforced steel a blend of blast furnace, slag and portland cement was used. A low water to cement ratio was obtained using a high-range water reducing admixture. In the splash zone, the piles were coated with epoxy. The dam construction involved use of five million tons of rock and broken stone and approximately ten million cubic feet of sand, extracted from the seabed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data