logo

King George Boulevard Walking and Safety Improvements for Surrey, British Columbia

Sector: Automotive • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The King George Boulevard Walking and Safety Improvements for Surrey, British Columbia project is intended to address the safety concerns along the corridor by installing pedestrian safety measures. The project will include wider sidewalks, curb extensions, additional crosswalks and accessible curb ramps. Modifications to traffic signals will be completed where possible to provide protected left-

Project Information FAQ

Project Information

5 Q
The project “King George Boulevard Walking and Safety Improvements for Surrey, British Columbia” is an infrastructure initiative in the Automotive sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The King George Boulevard Walking and Safety Improvements for Surrey, British Columbia project is intended to address the safety concerns along the corridor by installing pedestrian safety measures. The project will include wider sidewalks, curb extensions, additional crosswalks and accessible curb ramps. Modifications to traffic signals will be completed where possible to provide protected left-turns (to separate left turning vehicles from vulnerable road users) and leading pedestrian intervals (which give vulnerable road users a head start into the crosswalk before the vehicle green is shown to improve visibility to these road users).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data