logo

Kingamyambo Musonoi Tailings SARL

Sector: Residential • Location: Congo, Democratic Republic of

Source: International Finance Corporation (IFC)

Project
Completed

This SPI has been revised in order to reflect a slight change in the wording related to the process of categorization of any potential future investment in this project to ensure consistency with IFC procedures.The project is to prepare a definitive feasibility study (DFS), including marketing, technical, and environmental and social impact studies, for the re-treatment of processed oxide tailings

Project Information FAQ

Project Information

4 Q
The project “Kingamyambo Musonoi Tailings SARL” is an infrastructure initiative in the Residential sector, located in Congo, Democratic Republic of. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This SPI has been revised in order to reflect a slight change in the wording related to the process of categorization of any potential future investment in this project to ensure consistency with IFC procedures.The project is to prepare a definitive feasibility study (DFS), including marketing, technical, and environmental and social impact studies, for the re-treatment of processed oxide tailings from the Kolwezi concentrator, located in Katanga province, which began operations in the early 1950’s. Owing to the poor recovery rates obtained at the time, valuable amounts of copper and cobalt were discharged in the form of tailings. The tailings reserve consists of 112 million tonnes grading 1.49% copper and 0.32% cobalt. Preliminary technical studies indicate that a leaching and solvent extraction plant costing about US$300 million could produce 30,000 tonnes per annum (“tpa”) of copper and 5,500 tpa of cobalt, although technical, marketing, and financing factors, to be considered during the DFS, may dictate a staged development. The project company is Kingamyambo Musonoi Tailings SARL (“KMT”), a Congolese company which has been created for the purpose of exploiting the tailings.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data