logo

Kingdom’s First Large-Scale BESS Manufacturing Plant

Sector: Energy Storage • Location: Saudi Arabia

Source: SolarQuarter

Project
Planned

ZOE Energy Storage and a Saudi Arabian partner have entered into a joint venture to establish Saudi Arabia's first large-scale battery energy storage system (BESS) manufacturing plant. The facility will cover nearly 150 acres and be developed in two phases, with an initial annual production capacity of 6GWh starting commercial operations in Q1 2027, expanding to 18GWh in the second phase. The plan

Status
Prospective
Sector
Energy Storage, Manufacturing (Industrial), Commercial
Location
Saudi Arabia
Updated
22 Jul 2026
Source
SolarQuarter

ConstructChat

Ask ConstructChat about Kingdom’s First Large-Scale BESS Manufacturing Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Kingdom’s First Large-Scale BESS Manufacturing Plant” is an infrastructure initiative in the Energy Storage sector, located in Saudi Arabia. Taiyo aggregates data on it from SolarQuarter.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ZOE Energy Storage and a Saudi Arabian partner have entered into a joint venture to establish Saudi Arabia's first large-scale battery energy storage system (BESS) manufacturing plant. The facility will cover nearly 150 acres and be developed in two phases, with an initial annual production capacity of 6GWh starting commercial operations in Q1 2027, expanding to 18GWh in the second phase. The plant will follow advanced European manufacturing standards and support Saudi Arabia's renewable energy market and Vision 2030 goals.

Original sector

Energy

Location

Country

Saudi Arabia

Source

Source

SolarQuarter

URL

More Details

Record type

Project

Sector

Energy Storage, Manufacturing (Industrial), Commercial

Article published date

2026-05-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project