Kingfisher Oil Project
Sector: Oil and Gas • Location: Buliisa District, Uganda
Source: pan african visions
The Kingfisher project is another upstream oil development with 77% overall progress and 22 out of 19 wells required for first oil already drilled. Drilling operations are ongoing with construction works on industrial areas, flowlines, and lake water abstraction progressing.
- Status
- Under Construction
- Sector
- Oil and Gas, Water Supply and Storage, Manufacturing (Industrial)
- Location
- Buliisa District, Uganda
- Updated
- 22 Jul 2026
- Source
- pan african visions
ConstructChat
Ask ConstructChat about Kingfisher Oil Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Kingfisher project is another upstream oil development with 77% overall progress and 22 out of 19 wells required for first oil already drilled. Drilling operations are ongoing with construction works on industrial areas, flowlines, and lake water abstraction progressing. |
Original sector | Energy |
Location
Country | Uganda |
City | Buliisa District |
Source
Source | pan african visions |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Water Supply and Storage, Manufacturing (Industrial) |
Article published date | 2026-05-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
