logo
ProjectClosed

Kings County - Bridge Replacement

One of 10,000+ projects Taiyo tracks in Nova Scotia.

Source: Dodge USA

One project in kings county Project 1: berwick bridge(kin014), route 360, approximately 0.30 kilometres Total approximately ..0.30 kilometres Bridge replacement Berwick bridge (kin014) is a timber bridge located on route 360. In general, work on this contract Involves constructing a detour with detour structure, the removal and design build bridge replacement. In addition, clearing of highway, gru

Status
Closed
Sector
Commercial, Forest Products and Packaging, Water Supply and Storage, Bridge, Road, Government, Manufacturing (Industrial)
Location
Kingston, Nova Scotia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Kings County - Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Kings County - Bridge Replacement” is an infrastructure initiative in the Commercial sector, located in Kingston, Nova Scotia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

One project in kings county Project 1: berwick bridge(kin014), route 360, approximately 0.30 kilometres Total approximately ..0.30 kilometres Bridge replacement Berwick bridge (kin014) is a timber bridge located on route 360. In general, work on this contract Involves constructing a detour with detour structure, the removal and design build bridge replacement. In addition, clearing of highway, grubbing of highway, excavation, water for compaction & dust control, Gravel type 1s, 1 & 2, clear s...

Procurement method

Budget

Location

Country

Canada

State

Nova Scotia

City

Kingston

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Forest Products and Packaging, Water Supply and Storage, Bridge, Road, Government, Manufacturing (Industrial)

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project