Kings Highway Phases 1 & 2 Improvements
Sector: Water Supply and Storage • Location: Washington, New Jersey, United States of America
Source: Dodge USA
The work includes edge repair consisting of 1,408 SY milling and 350 Tons HMA 19M64 Base Course. Additional work includes 28,300 SY milling & 3,420 Tons HMA 9.5M64 Surface Course. Limits of Base Repair to be determined after the initial 2 milling is complete. Asphalt driveway aprons, driveway repairs, sloped asphalt edges and asphalt curbs are included. Modifications to storm sewer inlets and manh
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Road, Government, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Washington, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Kings Highway Phases 1 & 2 Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes edge repair consisting of 1,408 SY milling and 350 Tons HMA 19M64 Base Course. Additional work includes 28,300 SY milling & 3,420 Tons HMA 9.5M64 Surface Course. Limits of Base Repair to be determined after the initial 2 milling is complete. Asphalt driveway aprons, driveway repairs, sloped asphalt edges and asphalt curbs are included. Modifications to storm sewer inlets and manholes are scheduled in compliance with the NJDEP Stormwater Regulations. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Washington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Government, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
